Plantsight
Kestrel Process Group · 2026-08-28

Asset integrity overview

Every number below is derived live from the methodology in force. Change a rule in the Rule Studio and this page moves with it.

Assets on register
46
87% with a completed assessment
Immediate danger
12
Findings that force equipment out of service
Open findings
84
across 40 assessed assets
Overdue
5
0 due in the next 30 days
Never assessed
6
2 assessments in progress

Risk band by asset

Highest-scoring open finding on each asset's most recent completed assessment.

Lowscore ≤ 411

Monitor at next scheduled assessment

Moderatescore ≤ 99

Plan corrective work into the maintenance cycle

Highscore ≤ 149

Act before the equipment is next relied upon

Criticalscore ≤ 2511

Stop use, isolate, escalate to the responsible engineer

Findings by hazard

Hazard taxonomy comes from the methodology, not from code.

H-RECLoss of design or inspection traceability23
H-ACCAccess, egress and emergency response impaired16
H-ARCArc flash / electric shock12
H-ENTEntanglement or crushing at moving parts11
H-DRPDropped or swinging load7
H-STRStructural failure under load6

Facilities

FacilitySiteAssetsOverdueCriticalOpen findings
Northgate WorksArdmore Industrial Estate171540
Havenport TerminalDock Road153122
Lyndale PackingCranfield Way141522