Havenport Terminal · Utilities yard
Steam separator 102
Pressure vessel / air receiver · reassessed every 12 months · criticality B
Current risk
Moderate
Plan corrective work into the maintenance cycle
Open findings
1
highest score 8
Last assessed
2025-05-28
by J. Barros
Next due
2026-05-28
Overdue
Findings on the current assessment
from A-1005 · methodology v3.9Support or saddle section lossR-PV-08Non-conformingS4 × L2 = 8
The vessel supports show section loss or cracking and can no longer be assumed to carry design load.
Action Have the supports assessed by a competent engineer and repaired or replaced before the vessel is refilled.
Structural failure under load · due 2025-06-11 · API 510 §7.4
Assessment history
2025-05-28 · J. Barros
A-1005 · assessed under v3.9
2024-05-28 · R. Aldridge
A-1004 · assessed under v3.9
2023-05-28 · P. Nakamura
A-1003 · assessed under v3.9
Historical assessments keep the methodology version they were completed under. Re-scoring old records against a newer version is an explicit action, never a side effect of publishing.
Asset record
- Tag
- HP/PV-102
- Asset id
- PV-102
- Class
- Pressure vessel / air receiver
- Manufacturer
- Enerfab
- Model
- D929
- Serial
- 79621-28
- Installed
- 2021-05-01
- Facility
- Havenport Terminal, Dock Road
- Area
- Utilities yard
- Facility manager
- S. Ilori
- Criticality
- B
What this class is assessed on
- Identification and records5 questions · photo + image analysis
- Pressure relief5 questions · photo + image analysis
- External condition4 questions · photo + image analysis
- Instrumentation and surrounds4 questions
16 active rules · 9 vision cues.