Plantsight
← Equipment register
Havenport Terminal · Utilities yard

Steam separator 102

Pressure vessel / air receiver · reassessed every 12 months · criticality B

Latest report
Current risk
Moderate
Plan corrective work into the maintenance cycle
Open findings
1
highest score 8
Last assessed
2025-05-28
by J. Barros
Next due
2026-05-28
Overdue

Findings on the current assessment

from A-1005 · methodology v3.9
Support or saddle section lossR-PV-08Non-conformingS4 × L2 = 8

The vessel supports show section loss or cracking and can no longer be assumed to carry design load.

Action Have the supports assessed by a competent engineer and repaired or replaced before the vessel is refilled.

Structural failure under load · due 2025-06-11 · API 510 §7.4

Assessment history

2025-05-28 · J. Barros
A-1005 · assessed under v3.9
1 findingModerateReport
2024-05-28 · R. Aldridge
A-1004 · assessed under v3.9
1 findingModerateReport
2023-05-28 · P. Nakamura
A-1003 · assessed under v3.9
0 findingsLowReport

Historical assessments keep the methodology version they were completed under. Re-scoring old records against a newer version is an explicit action, never a side effect of publishing.

Asset record

Tag
HP/PV-102
Asset id
PV-102
Class
Pressure vessel / air receiver
Manufacturer
Enerfab
Model
D929
Serial
79621-28
Installed
2021-05-01
Facility
Havenport Terminal, Dock Road
Area
Utilities yard
Facility manager
S. Ilori
Criticality
B

What this class is assessed on

  • Identification and records
    5 questions · photo + image analysis
  • Pressure relief
    5 questions · photo + image analysis
  • External condition
    4 questions · photo + image analysis
  • Instrumentation and surrounds
    4 questions

16 active rules · 9 vision cues.