Plantsight
← Equipment register
Havenport Terminal · Packing hall

Case erector 102

Guarded machinery / conveyor · reassessed every 12 months · criticality A

Latest report
Current risk
High
Act before the equipment is next relied upon
Open findings
2
highest score 12
Last assessed
2025-05-28
by P. Nakamura
Next due
2026-05-28
Overdue

Findings on the current assessment

from A-1056 · methodology v3.9
Emergency stop out of reachR-GM-06Non-conformingS4 × L3 = 12

An operator cannot reach an emergency stop from every working position.

Action Add stops or a pull-cord run so no working position is more than the methodology's distance from one.

Entanglement or crushing at moving parts · due 2025-06-11 · AS 4024.1601 §5.5

Stored energy sources not documentedR-GM-10Records / traceabilityS3 × L3 = 9

Stored energy is not documented, so isolation cannot be verified as complete.

Action Walk the machine with the maintainer, list every energy source, and publish it at the isolation point.

Loss of design or inspection traceability · due 2025-06-27 · ISO 14118 §6

Assessment history

2025-05-28 · P. Nakamura
A-1056 · assessed under v3.9
2 findingsHighReport

Historical assessments keep the methodology version they were completed under. Re-scoring old records against a newer version is an explicit action, never a side effect of publishing.

Asset record

Tag
HP/GM-102
Asset id
GM-102
Class
Guarded machinery / conveyor
Manufacturer
Lindmark
Model
V946
Serial
44948-26
Installed
2007-03-01
Facility
Havenport Terminal, Dock Road
Area
Packing hall
Facility manager
S. Ilori
Criticality
A

What this class is assessed on

  • Identification and records
    3 questions · photo + image analysis
  • Guarding
    5 questions · photo + image analysis
  • Emergency stop and isolation
    5 questions
  • Workplace
    3 questions

17 active rules · 8 vision cues.