Compressor house distribution board 101
LV switchboard / distribution board · reassessed every 12 months · criticality C
Findings on the current assessment
from A-1024 · methodology v4.2Temperature rise at a termination is far beyond the alarm threshold and failure is imminent.
Action Shed load from the affected circuit now and remake the termination before the board is reloaded.
Arc flash / electric shock · due 2026-06-28 · NETA MTS §9.15
An unused way or cutout is open, so the enclosure no longer provides its rated protection.
Action Fit correct blanks and gland plates. Do not use tape or sheet offcuts.
Arc flash / electric shock · due 2026-07-05 · IEC 61439-1 §8.4.2
The enclosure cannot be closed and locked, so access is not restricted to authorised workers.
Action Repair or replace the door hardware and re-key the board to the electrical suite.
Arc flash / electric shock · due 2026-07-12 · AS/NZS 3000 §2.9.2
No thermographic survey has been recorded within the interval.
Action Book the survey while the board is under representative load, and file the report against the board identifier.
Loss of design or inspection traceability · due 2026-08-27 · NETA MTS §9.15
Assessment history
Historical assessments keep the methodology version they were completed under. Re-scoring old records against a newer version is an explicit action, never a side effect of publishing.
Asset record
- Tag
- NG/SB-101
- Asset id
- SB-101
- Class
- LV switchboard / distribution board
- Manufacturer
- Cortec Systems
- Model
- Q262
- Serial
- 71642-23
- Installed
- 2011-10-01
- Facility
- Northgate Works, Ardmore Industrial Estate
- Area
- Utilities yard
- Facility manager
- H. Vance
- Criticality
- C
What this class is assessed on
- Identification and records4 questions · photo + image analysis
- Enclosure integrity4 questions · photo + image analysis
- Terminations and thermal condition4 questions
- Protection and access4 questions
15 active rules · 7 vision cues.