Motor control centre 106

LV switchboard / distribution board · reassessed every 12 months · criticality A

Latest report
Current risk
Critical
Stop use, isolate, escalate to the responsible engineer
Open findings
3
highest score 15
Last assessed
2024-12-28
by T. Fenwick
Next due
2025-12-28
Overdue

Findings on the current assessment

from A-1029 · methodology v3.9
Severe thermal rise at a terminationR-SB-05Immediate dangerS5 × L3 = 15

Temperature rise at a termination is far beyond the alarm threshold and failure is imminent.

Action Shed load from the affected circuit now and remake the termination before the board is reloaded.

Arc flash / electric shock · due 2024-12-28 · NETA MTS §9.15

Blanking or gland plate missingR-SB-02Non-conformingS4 × L3 = 12

An unused way or cutout is open, so the enclosure no longer provides its rated protection.

Action Fit correct blanks and gland plates. Do not use tape or sheet offcuts.

Arc flash / electric shock · due 2025-01-04 · IEC 61439-1 §8.4.2

Main switch not identifiedR-SB-15Records / traceabilityS2 × L4 = 8

The main switch is not labelled, delaying isolation in an emergency.

Action Label the main switch with what it isolates, in durable marking.

Access, egress and emergency response impaired · due 2025-01-27 · AS/NZS 3000 §2.3.2

Assessment history

2024-12-28 · T. Fenwick
A-1029 · assessed under v3.9
3 findingsCriticalReport

Historical assessments keep the methodology version they were completed under. Re-scoring old records against a newer version is an explicit action, never a side effect of publishing.

Asset record

Tag
LY/SB-106
Asset id
SB-106
Class
LV switchboard / distribution board
Manufacturer
Mainline Electrical
Model
C503
Serial
37363-96
Installed
2009-07-01
Facility
Lyndale Packing, Cranfield Way
Area
Utilities yard
Facility manager
D. Petrov
Criticality
A

What this class is assessed on

  • Identification and records
    4 questions · photo + image analysis
  • Enclosure integrity
    4 questions · photo + image analysis
  • Terminations and thermal condition
    4 questions
  • Protection and access
    4 questions

15 active rules · 7 vision cues.