Plantsight
← Equipment register
Lyndale Packing · Utilities yard

Utilities distribution board 103

LV switchboard / distribution board · reassessed every 12 months · criticality B

Latest report
Current risk
Critical
Stop use, isolate, escalate to the responsible engineer
Open findings
7
highest score 15
Last assessed
2026-02-28
by M. Osei
Next due
2027-02-28
On schedule

Findings on the current assessment

from A-1025 · methodology v4.2
Energised parts reachableR-SB-01Immediate dangerfrom photoS5 × L3 = 15

Live parts can be contacted without removing a cover or using a tool.

Action Restrict access to the board immediately and have an electrical worker restore the dead front before it is handed back.

Arc flash / electric shock · due 2026-02-28 · AS/NZS 3000 §1.5.4

Blanking or gland plate missingR-SB-02Non-conformingfrom photoS4 × L3 = 12

An unused way or cutout is open, so the enclosure no longer provides its rated protection.

Action Fit correct blanks and gland plates. Do not use tape or sheet offcuts.

Arc flash / electric shock · due 2026-03-07 · IEC 61439-1 §8.4.2

No arc-flash or shock-hazard labellingR-SB-03Non-conformingfrom photoS3 × L4 = 12

The board carries no hazard label, so a worker cannot select PPE from information at the equipment.

Action Calculate incident energy for the board and fit a label showing the boundary and PPE category.

Arc flash / electric shock · due 2026-03-30 · NFPA 70E §130.5(H)

Working space obstructed by stored materialR-SB-08Non-conformingfrom photoS3 × L4 = 12

Material is stored in the space a worker must occupy to operate or escape from the board.

Action Clear the zone, mark it on the floor, and give the displaced material a defined home.

Access, egress and emergency response impaired · due 2026-03-07 · AS/NZS 3000 §2.9.3

Thermographic survey overdueR-SB-06Records / traceabilityS2 × L4 = 8

No thermographic survey has been recorded within the interval.

Action Book the survey while the board is under representative load, and file the report against the board identifier.

Loss of design or inspection traceability · due 2026-04-29 · NETA MTS §9.15

Main switch not identifiedR-SB-15Records / traceabilityS2 × L4 = 8

The main switch is not labelled, delaying isolation in an emergency.

Action Label the main switch with what it isolates, in durable marking.

Access, egress and emergency response impaired · due 2026-03-30 · AS/NZS 3000 §2.3.2

No single-line diagram at the boardR-SB-11Records / traceabilityS2 × L3 = 6

No single-line diagram is available at the equipment.

Action Produce and laminate a current single-line diagram and fix it at the board.

Loss of design or inspection traceability · due 2026-04-29 · IEC 61439-1 §6.2

Assessment history

2026-02-28 · M. Osei
A-1025 · assessed under v4.2 · 1 photo
7 findingsCriticalReport

Historical assessments keep the methodology version they were completed under. Re-scoring old records against a newer version is an explicit action, never a side effect of publishing.

Asset record

Tag
LY/SB-103
Asset id
SB-103
Class
LV switchboard / distribution board
Manufacturer
Vaughan Switchgear
Model
Z152
Serial
59281-49
Installed
2006-06-01
Facility
Lyndale Packing, Cranfield Way
Area
Utilities yard
Facility manager
D. Petrov
Criticality
B

What this class is assessed on

  • Identification and records
    4 questions · photo + image analysis
  • Enclosure integrity
    4 questions · photo + image analysis
  • Terminations and thermal condition
    4 questions
  • Protection and access
    4 questions

15 active rules · 7 vision cues.