Havenport Terminal · Compressor house

Workshop distribution board 111

LV switchboard / distribution board · reassessed every 12 months · criticality A

Latest report
Current risk
High
Act before the equipment is next relied upon
Open findings
1
highest score 12
Last assessed
2025-12-28
by P. Nakamura
Next due
2026-12-28
On schedule

Findings on the current assessment

from A-1038 · methodology v4.0
Working space obstructed by stored materialR-SB-08Non-conformingS3 × L4 = 12

Material is stored in the space a worker must occupy to operate or escape from the board.

Action Clear the zone, mark it on the floor, and give the displaced material a defined home.

Access, egress and emergency response impaired · due 2026-01-04 · AS/NZS 3000 §2.9.3

Assessment history

2025-12-28 · P. Nakamura
A-1038 · assessed under v4.0
1 findingHighReport
2024-12-28 · J. Barros
A-1037 · assessed under v3.9
0 findingsLowReport
2023-12-28 · T. Fenwick
A-1036 · assessed under v3.9
4 findingsHighReport

Historical assessments keep the methodology version they were completed under. Re-scoring old records against a newer version is an explicit action, never a side effect of publishing.

Asset record

Tag
HP/SB-111
Asset id
SB-111
Class
LV switchboard / distribution board
Manufacturer
Cortec Systems
Model
K466
Serial
51862-84
Installed
2006-03-01
Facility
Havenport Terminal, Dock Road
Area
Compressor house
Facility manager
S. Ilori
Criticality
A

What this class is assessed on

  • Identification and records
    4 questions · photo + image analysis
  • Enclosure integrity
    4 questions · photo + image analysis
  • Terminations and thermal condition
    4 questions
  • Protection and access
    4 questions

15 active rules · 7 vision cues.