Workshop distribution board 111
LV switchboard / distribution board · reassessed every 12 months · criticality A
Current risk
High
Act before the equipment is next relied upon
Open findings
1
highest score 12
Last assessed
2025-12-28
by P. Nakamura
Next due
2026-12-28
On schedule
Findings on the current assessment
from A-1038 · methodology v4.0Working space obstructed by stored materialR-SB-08Non-conformingS3 × L4 = 12
Material is stored in the space a worker must occupy to operate or escape from the board.
Action Clear the zone, mark it on the floor, and give the displaced material a defined home.
Access, egress and emergency response impaired · due 2026-01-04 · AS/NZS 3000 §2.9.3
Assessment history
2025-12-28 · P. Nakamura
A-1038 · assessed under v4.0
2024-12-28 · J. Barros
A-1037 · assessed under v3.9
2023-12-28 · T. Fenwick
A-1036 · assessed under v3.9
Historical assessments keep the methodology version they were completed under. Re-scoring old records against a newer version is an explicit action, never a side effect of publishing.
Asset record
- Tag
- HP/SB-111
- Asset id
- SB-111
- Class
- LV switchboard / distribution board
- Manufacturer
- Cortec Systems
- Model
- K466
- Serial
- 51862-84
- Installed
- 2006-03-01
- Facility
- Havenport Terminal, Dock Road
- Area
- Compressor house
- Facility manager
- S. Ilori
- Criticality
- A
What this class is assessed on
- Identification and records4 questions · photo + image analysis
- Enclosure integrity4 questions · photo + image analysis
- Terminations and thermal condition4 questions
- Protection and access4 questions
15 active rules · 7 vision cues.