Kestrel Process Group
Asset Integrity — equipment safety assessment
HP/SB-111
Workshop distribution board 111
Report A-1037
Methodology v3.9
2024-12-28
Assessed risk
Low
Highest score
0
Findings
0
Immediate
0
Coverage
15/15
Next due
2025-12-28
Monitor at next scheduled assessment
Asset class
LV switchboard / distribution board
Facility
Havenport Terminal, Dock Road
Area
Compressor house
Criticality
A
Manufacturer
Cortec Systems
Model / serial
K466 / 51862-84
Installed
2006-03-01
Inspector
J. Barros
Findings (0)
No rule in methodology v3.9 was triggered by the recorded answers or accepted photographic evidence.
Assessment record
Identification and records · Board identifierHP-SB-111
Identification and records · Is a current single-line diagram available at the board?Yes
Identification and records · Is the circuit schedule present and matching the installed ways?Yes
Identification and records · Is an arc-flash / shock-hazard label fitted?Yes
Enclosure integrity · Do the doors close and lock as designed?Yes
Enclosure integrity · Are all unused ways blanked and gland plates complete?Yes
Enclosure integrity · Are any energised parts reachable without a tool?No
Enclosure integrity · Enclosure damageCosmetic
Terminations and thermal condition · Months since last thermographic survey19 months
Terminations and thermal condition · Was a hotspot recorded above the alarm threshold?No
Terminations and thermal condition · Are cable terminations supported and strain-relieved?Yes
Protection and access · Months since residual current devices were tested4 months
Protection and access · Is the main switch identified and its function labelled?Yes
Protection and access · Clear working space in front of the board1319 mm
Protection and access · Is the working space free of stored material?Yes
The PDF is generated server-side from this same data — same findings, same wording, same methodology version, plus the photo plate and a sign-off block.