Kestrel Process Group
Asset Integrity — equipment safety assessment

HP/SB-111

Workshop distribution board 111

Report A-1036
Methodology v3.9
2023-12-28
Assessed risk
High
Highest score
12
Findings
4
Immediate
0
Coverage
15/15
Next due
2024-12-27

Act before the equipment is next relied upon

Asset class
LV switchboard / distribution board
Facility
Havenport Terminal, Dock Road
Area
Compressor house
Criticality
A
Manufacturer
Cortec Systems
Model / serial
K466 / 51862-84
Installed
2006-03-01
Inspector
T. Fenwick

Findings (4)

R-SB-02Blanking or gland plate missingNon-conformingS4 × L3 = 12High

An unused way or cutout is open, so the enclosure no longer provides its rated protection.

Action Fit correct blanks and gland plates. Do not use tape or sheet offcuts.

Arc flash / electric shock · due 2024-01-04 · IEC 61439-1 §8.4.2

R-SB-14Terminations unsupportedNon-conformingS3 × L3 = 9Moderate

Cable terminations carry mechanical load that the connection was not designed to take.

Action Fit cleats or a support rail so no weight or pull is carried by the termination.

Arc flash / electric shock · due 2024-01-27 · AS/NZS 3000 §3.7.2

R-SB-06Thermographic survey overdueRecords / traceabilityS2 × L4 = 8Moderate

No thermographic survey has been recorded within the interval.

Action Book the survey while the board is under representative load, and file the report against the board identifier.

Loss of design or inspection traceability · due 2024-02-26 · NETA MTS §9.15

R-SB-10Circuit schedule missing or out of dateRecords / traceabilityS2 × L4 = 8Moderate

The circuit schedule does not match the installed ways, so isolation cannot be planned from it.

Action Verify every way and reprint the schedule inside the door.

Loss of design or inspection traceability · due 2024-01-27 · AS/NZS 3000 §2.10

Assessment record

Identification and records · Board identifierHP-SB-111
Identification and records · Is a current single-line diagram available at the board?Yes
Identification and records · Is the circuit schedule present and matching the installed ways?No
Identification and records · Is an arc-flash / shock-hazard label fitted?Yes
Enclosure integrity · Do the doors close and lock as designed?Yes
Enclosure integrity · Are all unused ways blanked and gland plates complete?No
Enclosure integrity · Are any energised parts reachable without a tool?No
Enclosure integrity · Enclosure damageCosmetic
Terminations and thermal condition · Months since last thermographic survey36 months
Terminations and thermal condition · Was a hotspot recorded above the alarm threshold?No
Terminations and thermal condition · Are cable terminations supported and strain-relieved?No
Protection and access · Months since residual current devices were tested2 months
Protection and access · Is the main switch identified and its function labelled?Yes
Protection and access · Clear working space in front of the board1587 mm
Protection and access · Is the working space free of stored material?Yes