Havenport Terminal · Compressor house

Steam separator 105

Pressure vessel / air receiver · reassessed every 12 months · criticality A

Latest report
Current risk
High
Act before the equipment is next relied upon
Open findings
2
highest score 12
Last assessed
2025-10-28
by P. Nakamura
Next due
2026-10-28
On schedule

Findings on the current assessment

from A-1009 · methodology v4.0
Relief discharge path obstructedR-PV-03Non-conformingS4 × L3 = 12

The relief device cannot discharge freely to a safe location.

Action Clear the discharge path and re-route it away from any walkway or work position.

Uncontrolled release of stored pressure · due 2025-11-04 · AS/NZS 3788 §5.6

Internal inspection overdueR-PV-12Records / traceabilityS3 × L3 = 9

No internal inspection has been recorded within the interval.

Action Book the internal inspection at the next shutdown and clean the vessel in advance so the survey is not deferred again.

Loss of design or inspection traceability · due 2025-12-27 · AS/NZS 3788 §6.4

Assessment history

2025-10-28 · P. Nakamura
A-1009 · assessed under v4.0
2 findingsHighReport
2024-10-28 · T. Fenwick
A-1008 · assessed under v3.9
2 findingsCriticalReport

Historical assessments keep the methodology version they were completed under. Re-scoring old records against a newer version is an explicit action, never a side effect of publishing.

Asset record

Tag
HP/PV-105
Asset id
PV-105
Class
Pressure vessel / air receiver
Manufacturer
Wessex Vessels
Model
K343
Serial
78780-58
Installed
2004-10-01
Facility
Havenport Terminal, Dock Road
Area
Compressor house
Facility manager
S. Ilori
Criticality
A

What this class is assessed on

  • Identification and records
    5 questions · photo + image analysis
  • Pressure relief
    5 questions · photo + image analysis
  • External condition
    4 questions · photo + image analysis
  • Instrumentation and surrounds
    4 questions

16 active rules · 9 vision cues.