Steam separator 105
Pressure vessel / air receiver · reassessed every 12 months · criticality A
Findings on the current assessment
from A-1009 · methodology v4.0The relief device cannot discharge freely to a safe location.
Action Clear the discharge path and re-route it away from any walkway or work position.
Uncontrolled release of stored pressure · due 2025-11-04 · AS/NZS 3788 §5.6
No internal inspection has been recorded within the interval.
Action Book the internal inspection at the next shutdown and clean the vessel in advance so the survey is not deferred again.
Loss of design or inspection traceability · due 2025-12-27 · AS/NZS 3788 §6.4
Assessment history
Historical assessments keep the methodology version they were completed under. Re-scoring old records against a newer version is an explicit action, never a side effect of publishing.
Asset record
- Tag
- HP/PV-105
- Asset id
- PV-105
- Class
- Pressure vessel / air receiver
- Manufacturer
- Wessex Vessels
- Model
- K343
- Serial
- 78780-58
- Installed
- 2004-10-01
- Facility
- Havenport Terminal, Dock Road
- Area
- Compressor house
- Facility manager
- S. Ilori
- Criticality
- A
What this class is assessed on
- Identification and records5 questions · photo + image analysis
- Pressure relief5 questions · photo + image analysis
- External condition4 questions · photo + image analysis
- Instrumentation and surrounds4 questions
16 active rules · 9 vision cues.