HP/PV-105
Steam separator 105
Stop use, isolate, escalate to the responsible engineer
Findings (2)
The vessel is in service with no over-pressure protection fitted.
Action Isolate and depressurise the vessel now. Do not return it to service until a correctly sized relief device is fitted and certified against the registered design.
Uncontrolled release of stored pressure · due 2024-10-28 · AS/NZS 3788 §5.2
Condensate cannot be drained, which drives internal corrosion at the bottom of the shell.
Action Free or replace the drain and add a daily drain check to the operator round.
Structural failure under load · due 2024-11-27 · API 510 §6.4
Assessment record
The PDF is generated server-side from this same data — same findings, same wording, same methodology version, plus the photo plate and a sign-off block.