Plantsight
NG/GM-104
Open assessment
Kestrel Process Group
Asset Integrity — equipment safety assessment

NG/GM-104

Case erector 104

Report A-1061
Methodology v4.0
2025-10-28
Assessed risk
High
Highest score
12
Findings
1
Immediate
0
Coverage
16/16
Next due
2026-10-28

Act before the equipment is next relied upon

Asset class
Guarded machinery / conveyor
Facility
Northgate Works, Ardmore Industrial Estate
Area
Boiler house
Criticality
B
Manufacturer
Vertek
Model / serial
F952 / 34885-84
Installed
2010-09-01
Inspector
P. Nakamura

Findings (1)

R-GM-06Emergency stop out of reachNon-conformingS4 × L3 = 12High

An operator cannot reach an emergency stop from every working position.

Action Add stops or a pull-cord run so no working position is more than the methodology's distance from one.

Entanglement or crushing at moving parts · due 2025-11-11 · AS 4024.1601 §5.5

Assessment record

Identification and records · Is a current risk assessment on file for this machine?Yes
Identification and records · Is the manufacturer's manual available on site?Yes
Identification and records · Has the machine been modified since commissioning?No
Guarding · Are all fixed guards present and secured with tools-required fixings?Yes
Guarding · Are movable guards interlocked?Yes
Guarding · Is any interlock bypassed, taped or defeated?No
Guarding · Are in-running nips and drives guarded?Yes
Guarding · Largest gap in guarding16 mm
Emergency stop and isolation · Furthest distance from any operating position to an emergency stop4.6 m
Emergency stop and isolation · Does the pull-cord stop the machine from every point along its run?Yes
Emergency stop and isolation · Does restart require a deliberate reset at the machine?Yes
Emergency stop and isolation · Is the isolation / lockout point identified and lockable?Yes
Emergency stop and isolation · Are all stored energy sources documented for isolation?Yes
Workplace · Is hazard and isolation signage in place?Yes
Workplace · Clear walkway width alongside the machine1030 mm
Workplace · Housekeeping around the machineClean

The PDF is generated server-side from this same data — same findings, same wording, same methodology version, plus the photo plate and a sign-off block.