Plantsight
NG/CR-104
Open assessment
Kestrel Process Group
Asset Integrity — equipment safety assessment

NG/CR-104

Workshop jib hoist 104

Report A-1045
Methodology v3.9
2025-04-28
Assessed risk
Low
Highest score
0
Findings
0
Immediate
0
Coverage
17/17
Next due
2025-10-28

Monitor at next scheduled assessment

Asset class
Overhead travelling crane / hoist
Facility
Northgate Works, Ardmore Industrial Estate
Area
Line 4
Criticality
C
Manufacturer
Steelbridge Lifting
Model / serial
N776 / 91916-31
Installed
2016-09-01
Inspector
M. Osei

Findings (0)

No rule in methodology v3.9 was triggered by the recorded answers or accepted photographic evidence.

Assessment record

Identification and records · Is the safe working load marked and legible?Yes
Identification and records · Marked safe working load5009 kg
Identification and records · Is the crane log book current?Yes
Identification and records · Months since last major inspection12 months
Hook and block · Is the hook safety latch fitted and effective?Yes
Hook and block · Throat opening increase over as-new4 %
Hook and block · Is the hook free of twist, cracking or gouging?Yes
Hook and block · Does the block rotate and seat freely?Yes
Rope, chain and reeving · Broken wires in any one rope lay1 wires
Rope, chain and reeving · Rope deformationMinor
Rope, chain and reeving · Is the rope adequately lubricated and free of corrosion?Yes
Rope, chain and reeving · Are the rope terminations correct and secure?Yes
Controls, limits and structure · Does the upper hoist limit operate on test?Yes
Controls, limits and structure · Does the emergency stop isolate all motions?Yes
Controls, limits and structure · Does the hoist brake hold the test load without creep?Yes
Controls, limits and structure · Are travel end stops and buffers in place and undamaged?Yes
Controls, limits and structure · Pendant / control conditionSound

The PDF is generated server-side from this same data — same findings, same wording, same methodology version, plus the photo plate and a sign-off block.