LY/SB-106
Motor control centre 106
Stop use, isolate, escalate to the responsible engineer
Findings (3)
Temperature rise at a termination is far beyond the alarm threshold and failure is imminent.
Action Shed load from the affected circuit now and remake the termination before the board is reloaded.
Arc flash / electric shock · due 2024-12-28 · NETA MTS §9.15
An unused way or cutout is open, so the enclosure no longer provides its rated protection.
Action Fit correct blanks and gland plates. Do not use tape or sheet offcuts.
Arc flash / electric shock · due 2025-01-04 · IEC 61439-1 §8.4.2
The main switch is not labelled, delaying isolation in an emergency.
Action Label the main switch with what it isolates, in durable marking.
Access, egress and emergency response impaired · due 2025-01-27 · AS/NZS 3000 §2.3.2
Assessment record
The PDF is generated server-side from this same data — same findings, same wording, same methodology version, plus the photo plate and a sign-off block.