NG/PV-113
Air receiver 113
Plan corrective work into the maintenance cycle
Findings (3)
The vessel cannot be traced to its registered design data from markings on the equipment.
Action Recover the design registration from the plant register and fit a durable replacement plate carrying the registration number and MAWP.
Loss of design or inspection traceability · due 2026-07-27 · AS/NZS 3788 §4.4
Condensate cannot be drained, which drives internal corrosion at the bottom of the shell.
Action Free or replace the drain and add a daily drain check to the operator round.
Structural failure under load · due 2026-06-27 · API 510 §6.4
Operating pressure cannot be read at the vessel.
Action Fit a gauge spanning at least 1.5 times MAWP and mark the normal operating range on the dial.
Uncontrolled release of stored pressure · due 2026-06-27 · AS/NZS 3788 §5.7
Assessment record
The PDF is generated server-side from this same data — same findings, same wording, same methodology version, plus the photo plate and a sign-off block.