Northgate Works · Compressor house

Air receiver 113

Pressure vessel / air receiver · reassessed every 12 months · criticality B

Latest report
Current risk
Moderate
Plan corrective work into the maintenance cycle
Open findings
3
highest score 8
Last assessed
2026-05-28
by M. Osei
Next due
2027-05-28
On schedule

Findings on the current assessment

from A-1023 · methodology v4.2
Data plate missing or unreadableR-PV-10Records / traceabilityS2 × L4 = 8

The vessel cannot be traced to its registered design data from markings on the equipment.

Action Recover the design registration from the plant register and fit a durable replacement plate carrying the registration number and MAWP.

Loss of design or inspection traceability · due 2026-07-27 · AS/NZS 3788 §4.4

Drain inoperable or condensate presentR-PV-14ObservationS2 × L4 = 8

Condensate cannot be drained, which drives internal corrosion at the bottom of the shell.

Action Free or replace the drain and add a daily drain check to the operator round.

Structural failure under load · due 2026-06-27 · API 510 §6.4

Pressure gauge missing or unreadableR-PV-13ObservationS2 × L3 = 6

Operating pressure cannot be read at the vessel.

Action Fit a gauge spanning at least 1.5 times MAWP and mark the normal operating range on the dial.

Uncontrolled release of stored pressure · due 2026-06-27 · AS/NZS 3788 §5.7

Assessment history

2026-05-28 · M. Osei
A-1023 · assessed under v4.2
3 findingsModerateReport
2025-05-28 · M. Osei
A-1022 · assessed under v3.9
0 findingsLowReport
2024-05-28 · P. Nakamura
A-1021 · assessed under v3.9
0 findingsLowReport

Historical assessments keep the methodology version they were completed under. Re-scoring old records against a newer version is an explicit action, never a side effect of publishing.

Asset record

Tag
NG/PV-113
Asset id
PV-113
Class
Pressure vessel / air receiver
Manufacturer
Enerfab
Model
A522
Serial
68313-37
Installed
2006-03-01
Facility
Northgate Works, Ardmore Industrial Estate
Area
Compressor house
Facility manager
H. Vance
Criticality
B

What this class is assessed on

  • Identification and records
    5 questions · photo + image analysis
  • Pressure relief
    5 questions · photo + image analysis
  • External condition
    4 questions · photo + image analysis
  • Instrumentation and surrounds
    4 questions

16 active rules · 9 vision cues.