Plantsight
NG/PV-101
Open assessment
Kestrel Process Group
Asset Integrity — equipment safety assessment

NG/PV-101

Hydro-pneumatic accumulator 101

Report A-1002
Methodology v4.2
2026-06-28
Assessed risk
Moderate
Highest score
6
Findings
1
Immediate
0
Coverage
18/18
Next due
2027-06-28

Plan corrective work into the maintenance cycle

Asset class
Pressure vessel / air receiver
Facility
Northgate Works, Ardmore Industrial Estate
Area
Goods in
Criticality
B
Manufacturer
Wessex Vessels
Model / serial
V624 / 81961-48
Installed
2006-01-01
Inspector
M. Osei

Findings (1)

R-PV-15Working space around the vessel restrictedImprovement opportunityS2 × L3 = 6Moderate

There is not enough clear space to inspect, isolate or escape from the vessel position.

Action Clear and mark the working space around the vessel.

Access, egress and emergency response impaired · due 2026-08-27 · ISO 12100 §6.2.7

Assessment record

Identification and records · Is the manufacturer's data plate present and legible?Yes
Identification and records · Design registration / plant numberPVR-81961
Identification and records · Maximum allowable working pressure1008 kPa
Identification and records · Months since last internal inspection43 months
Identification and records · Is the pressure test within its interval?Yes
Pressure relief · Is a pressure relief device fitted?Yes
Pressure relief · Is the set pressure at or below MAWP?Yes
Pressure relief · Months since relief device certification12 months
Pressure relief · Discharge pathClear to safe area
Pressure relief · Is an isolation valve fitted between the vessel and the relief device?No
External condition · External corrosionLight
External condition · Are the visible weld seams free of cracking or undercut?Yes
External condition · Saddle and support conditionSurface corrosion
External condition · Is the drain operable and the vessel free of standing condensate?Yes
Instrumentation and surrounds · Is a pressure gauge fitted and readable?Yes
Instrumentation and surrounds · Is the isolation point identified and accessible?Yes
Instrumentation and surrounds · Clear working space around the vessel411 mm
Instrumentation and surrounds · Is required signage in place?Yes

The PDF is generated server-side from this same data — same findings, same wording, same methodology version, plus the photo plate and a sign-off block.