Packing hall sub-board 104
LV switchboard / distribution board · reassessed every 12 months · criticality B
Findings on the current assessment
from A-1027 · methodology v4.0Physical damage has compromised the enclosure's rated ingress protection.
Action Repair the enclosure to its rating, and add protection if the damage was caused by vehicle or plant movement.
Arc flash / electric shock · due 2026-01-27 · IEC 61439-1 §8.2
No thermographic survey has been recorded within the interval.
Action Book the survey while the board is under representative load, and file the report against the board identifier.
Loss of design or inspection traceability · due 2026-02-26 · NETA MTS §9.15
Assessment history
Historical assessments keep the methodology version they were completed under. Re-scoring old records against a newer version is an explicit action, never a side effect of publishing.
Asset record
- Tag
- NG/SB-104
- Asset id
- SB-104
- Class
- LV switchboard / distribution board
- Manufacturer
- Cortec Systems
- Model
- M915
- Serial
- 94376-74
- Installed
- 2017-02-01
- Facility
- Northgate Works, Ardmore Industrial Estate
- Area
- Utilities yard
- Facility manager
- H. Vance
- Criticality
- B
What this class is assessed on
- Identification and records4 questions · photo + image analysis
- Enclosure integrity4 questions · photo + image analysis
- Terminations and thermal condition4 questions