Pressure vessel / air receiver · reassessed every 12 months · criticality B
Current risk
Moderate
Plan corrective work into the maintenance cycle
Open findings
1
highest score 6
Last assessed
2026-05-28
by M. Osei
Next due
2027-05-28
On schedule
Findings on the current assessment
from A-1010 · methodology v4.2Pressure gauge missing or unreadableR-PV-13ObservationS2 × L3 = 6
Operating pressure cannot be read at the vessel.
Action Fit a gauge spanning at least 1.5 times MAWP and mark the normal operating range on the dial.
Uncontrolled release of stored pressure · due 2026-06-27 · AS/NZS 3788 §5.7
Assessment history
2026-05-28 · M. Osei
A-1010 · assessed under v4.2
Historical assessments keep the methodology version they were completed under. Re-scoring old records against a newer version is an explicit action, never a side effect of publishing.
Asset record
- Tag
- LY/PV-106
- Asset id
- PV-106
- Class
- Pressure vessel / air receiver
- Manufacturer
- Halcyon Tank
- Model
- S241
- Serial
- 26300-63
- Installed
- 2007-10-01
- Facility
- Lyndale Packing, Cranfield Way
- Area
- Compressor house
- Facility manager
- D. Petrov
- Criticality
- B
What this class is assessed on
- Identification and records5 questions · photo + image analysis
- Pressure relief5 questions · photo + image analysis
- External condition4 questions · photo + image analysis
- Instrumentation and surrounds4 questions