Plantsight
← Equipment register
Lyndale Packing · Compressor house

Nitrogen buffer vessel 106

Pressure vessel / air receiver · reassessed every 12 months · criticality B

Latest report
Current risk
Moderate
Plan corrective work into the maintenance cycle
Open findings
1
highest score 6
Last assessed
2026-05-28
by M. Osei
Next due
2027-05-28
On schedule

Findings on the current assessment

from A-1010 · methodology v4.2
Pressure gauge missing or unreadableR-PV-13ObservationS2 × L3 = 6

Operating pressure cannot be read at the vessel.

Action Fit a gauge spanning at least 1.5 times MAWP and mark the normal operating range on the dial.

Uncontrolled release of stored pressure · due 2026-06-27 · AS/NZS 3788 §5.7

Assessment history

2026-05-28 · M. Osei
A-1010 · assessed under v4.2
1 findingModerateReport

Historical assessments keep the methodology version they were completed under. Re-scoring old records against a newer version is an explicit action, never a side effect of publishing.

Asset record

Tag
LY/PV-106
Asset id
PV-106
Class
Pressure vessel / air receiver
Manufacturer
Halcyon Tank
Model
S241
Serial
26300-63
Installed
2007-10-01
Facility
Lyndale Packing, Cranfield Way
Area
Compressor house
Facility manager
D. Petrov
Criticality
B

What this class is assessed on

  • Identification and records
    5 questions · photo + image analysis
  • Pressure relief
    5 questions · photo + image analysis
  • External condition
    4 questions · photo + image analysis
  • Instrumentation and surrounds
    4 questions

16 active rules · 9 vision cues.