Trim press 110
Guarded machinery / conveyor · reassessed every 12 months · criticality A
Findings on the current assessment
from A-1070 · methodology v4.0The pull-cord does not stop the machine from every point along the conveyor.
Action Re-tension the cord, replace the failed switch, and prove a stop from each end and the mid-point.
Entanglement or crushing at moving parts · due 2026-02-04 · ISO 13850 §4.4
No risk assessment is held for the machine in its current configuration.
Action Complete a machine risk assessment and file it against the asset number.
Loss of design or inspection traceability · due 2026-03-29 · ISO 12100 §5
The walkway beside the machine is narrower than the methodology allows.
Action Widen or re-route the walkway, or barrier it off if the width cannot be achieved.
Access, egress and emergency response impaired · due 2026-03-29 · ISO 14122-2 §4.2
Assessment history
Historical assessments keep the methodology version they were completed under. Re-scoring old records against a newer version is an explicit action, never a side effect of publishing.
Asset record
- Tag
- NG/GM-110
- Asset id
- GM-110
- Class
- Guarded machinery / conveyor
- Manufacturer
- Preston Automation
- Model
- V411
- Serial
- 53589-55
- Installed
- 2004-05-01
- Facility
- Northgate Works, Ardmore Industrial Estate
- Area
- Goods in
- Facility manager
- H. Vance
- Criticality
- A
What this class is assessed on
- Identification and records3 questions · photo + image analysis
- Guarding5 questions · photo + image analysis
- Emergency stop and isolation5 questions
- Workplace3 questions
17 active rules · 8 vision cues.