Boiler house crane 106
Overhead travelling crane / hoist · reassessed every 6 months · criticality A
Findings on the current assessment
from A-1050 · methodology v4.2Rope condition meets the discard criteria in the methodology.
Action Take the crane out of service and replace the rope as an assembly, with a certificate for the new rope.
Dropped or swinging load · due 2026-07-28 · ISO 4309 §5.2
Corrosion or lack of lubrication is degrading the rope faster than the inspection interval assumes.
Action Clean and dress the rope with the manufacturer's lubricant and shorten the inspection interval until the trend stops.
Dropped or swinging load · due 2026-08-11 · ISO 4309 §5.5
Assessment history
Historical assessments keep the methodology version they were completed under. Re-scoring old records against a newer version is an explicit action, never a side effect of publishing.
Asset record
- Tag
- LY/CR-106
- Asset id
- CR-106
- Class
- Overhead travelling crane / hoist
- Manufacturer
- Steelbridge Lifting
- Model
- G794
- Serial
- 25038-97
- Installed
- 2015-11-01
- Facility
- Lyndale Packing, Cranfield Way
- Area
- Boiler house
- Facility manager
- D. Petrov
- Criticality
- A
What this class is assessed on
- Identification and records4 questions · photo + image analysis
- Hook and block4 questions · photo + image analysis
- Rope, chain and reeving4 questions · photo + image analysis
- Controls, limits and structure5 questions
17 active rules · 9 vision cues.