Plantsight
LY/SB-112
Open assessment
Kestrel Process Group
Asset Integrity — equipment safety assessment

LY/SB-112

Motor control centre 112

Report A-1040
Methodology v4.2
2026-03-28
Assessed risk
Low
Highest score
0
Findings
0
Immediate
0
Coverage
15/15
Next due
2027-03-28

Monitor at next scheduled assessment

Asset class
LV switchboard / distribution board
Facility
Lyndale Packing, Cranfield Way
Area
Boiler house
Criticality
A
Manufacturer
Vaughan Switchgear
Model / serial
I554 / 62078-96
Installed
2020-08-01
Inspector
T. Fenwick

Findings (0)

No rule in methodology v4.2 was triggered by the recorded answers or accepted photographic evidence.

Assessment record

Identification and records · Board identifierLY-SB-112
Identification and records · Is a current single-line diagram available at the board?Yes
Identification and records · Is the circuit schedule present and matching the installed ways?Yes
Identification and records · Is an arc-flash / shock-hazard label fitted?Yes
Enclosure integrity · Do the doors close and lock as designed?Yes
Enclosure integrity · Are all unused ways blanked and gland plates complete?Yes
Enclosure integrity · Are any energised parts reachable without a tool?No
Enclosure integrity · Enclosure damageNone
Terminations and thermal condition · Months since last thermographic survey2 months
Terminations and thermal condition · Was a hotspot recorded above the alarm threshold?No
Terminations and thermal condition · Are cable terminations supported and strain-relieved?Yes
Protection and access · Months since residual current devices were tested4 months
Protection and access · Is the main switch identified and its function labelled?Yes
Protection and access · Clear working space in front of the board1515 mm
Protection and access · Is the working space free of stored material?Yes