HP/PV-111
Steam separator 111
Plan corrective work into the maintenance cycle
Findings (3)
An isolation valve is installed between the vessel and its relief device, allowing the protection to be shut off.
Action Remove the valve, or fit an approved locked-open arrangement with a documented control.
Uncontrolled release of stored pressure · due 2026-01-27 · ASME PCC-3 §5.4
The vessel cannot be traced to its registered design data from markings on the equipment.
Action Recover the design registration from the plant register and fit a durable replacement plate carrying the registration number and MAWP.
Loss of design or inspection traceability · due 2026-02-26 · AS/NZS 3788 §4.4
Condensate cannot be drained, which drives internal corrosion at the bottom of the shell.
Action Free or replace the drain and add a daily drain check to the operator round.
Structural failure under load · due 2026-01-27 · API 510 §6.4
Assessment record
The PDF is generated server-side from this same data — same findings, same wording, same methodology version, plus the photo plate and a sign-off block.